PROJECT ID |
PROJECT LOCATIONPROJECT LIMITS(project length) |
PROJECT DESCRIPTION |
RECOMMENDED FORFUNDING |
% OF TOTAL FUNDING |
ADDITIONAL NON-CITY FUNDING(C: confirmed)(P: pursue grants) |
PROJECT ATTRIBUTES |
||
East Ponce/Church St Sidewalks |
Church Street from Erskine Rd to East Ponce de Leon Ave & East Ponce de Leon Ave from Church St. to approximately 500 feet east of the East Ponce de Leon/ Brockett Road intersection (bus stop across from Tahoe Village Shopping Center)(1700 feet) |
Construct 5 foot sidewalks including a sidewalk crossing at CSX RR, new granite header, new ADA ramps, paint four (4) crosswalks with corresponding signage, two pedestrian push button poles/signal heads, safety fencing to discourage pedestrian crossing of the RR right-of-way, and concrete pads at four MARTA bus stops |
$800,000 |
6.8 |
$120,000(C) |
Dirt paths exist on back of curb due to heavy pedestrian useWheelchair bound pedestrians observed on roadNo sidewalks exist currently within scope of workDirt pads at bus stops |
||
Montreal Rd. Pedestrian Improvements |
Montreal Rd from Clarkston Industrial Blvd. to approximately Hill St.(1600 feet) |
New crosswalk - pedestrian bus stop pad and ramp - pedestrian crossing signal adjacent to Avalon Park apartments, various sidewalk and driveway reconstruction including striping within project limits to meet ADA standards |
$250,000 |
2.1 |
$0.00 |
Sidewalk and driveway ramps are not ADA accessible on corridorADA accessibility at bus stop required |
||
Market StreetSidewalks |
City Annex to Market Crossing subdivision entrance(3100 feet) |
New sidewalk on east and south side of Market Street (one side only) includes power pole/water meter & valve relocations, driveway reconstructions, retaining wall and landscape replacement; temporary easement acquisitions anticipated |
$700,000 |
6.0 |
LMIG(C) |
Sidewalks do not exist on Market StreetPedestrians must use street to walk to downtown Clarkston |